Oscar Smith High School Addition

To eliminate overcrowding, a two-story classroom wing was added to the existing Oscar Smith High School. The 31,577 SF building addition includes 20 classrooms, two science labs, and a shared preparation room. Offices, workrooms, storage areas, and restrooms are additional areas included in the project. MSA provided environmental, surveying, and civil engineering services and was involved with construction oversight. As-built surveys were performed at the conclusion of construction.

Location
Chesapeake
VA

Services Provided
Civil Engineering
Environmental
Surveying

Market
Education